N.H. Admin. Code § Site 102.12

Current through Register No. 50, December 12, 2024
Section Site 102.12 - Best practical measures

"Best practical measures" means available, effective, and economically feasible on-site or off-site methods or technologies used during siting, design, construction, and operation of an energy facility that effectively avoid, minimize, or mitigate relevant impacts.

N.H. Admin. Code § Site 102.12

#9182, eff 6-17-08

Amended by Volume XXXVI Number 01, Filed January 7, 2016, Proposed by #10993, Effective 12/16/2015.