N.H. Admin. Code § Saf-C 3310.03

Current through Register No. 50, December 12, 2024
Section Saf-C 3310.03 - Destructive Disassembly
(a) Destructive disassembly of certified modular buildings and building components shall not be performed in order to conduct tests or inspections, with the exception of post certification modification as specified by Saf-C 3310.01(a).
(b) Standards or test criteria, different from those adopted by the department, shall not be imposed.
(c) The responsibility for destructive disassembly and repairs shall be determined by the department on a case-by-case basis and as deemed necessary to assure compliance with this chapter.

N.H. Admin. Code § Saf-C 3310.03

#5439, eff 7-24-92; ss by #5935, eff 12-20-94; ss by #6885, eff 11-18-98; ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07

New. #9752, eff 7-9-10 (from Saf-C 3311.03 )

Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12737, Effective 3/8/2019, Expires 3/8/2029.