N.H. Admin. Code § Saf-C 3308.02

Current through Register No. 50, December 12, 2024
Section Saf-C 3308.02 - Renewal of Manufacturer

On an annual basis, no later than 45 days prior to the expiration of manufacturer approval pursuant to Saf-C 3308.01(d), the manufacturer shall submit the following to the department:

(a) A completed application, pursuant to Saf-C 3308.01, clearly reflecting any changes, amendments, or revisions to its building system or quality assurance program; and
(b) A renewal fee of $1000.00 to the department, pursuant to RSA 205-C:6.

N.H. Admin. Code § Saf-C 3308.02

#5439, eff 7-24-92; ss by #6810, INTERIM, eff 7-25-98, EXPIRES: 11-22-98; ss by #6885, eff 11-18-98;ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07

New. #9752, eff 7-9-10

Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12737, Effective 3/8/2019, Expires 3/8/2029.