Approval from the director to extend the 180 day period for changes in land use shall be valid for up to 270 days from the original completion date of the cutting operation.
N.H. Admin. Code § Res 5302.08
#8441, eff 10-1-05; ss by #10547, eff 3-21-14 (from Res 5302.09 )