N.H. Admin. Code § Puc 908.10

Current through Register No. 50, December 12, 2024
Section Puc 908.10 - Transferability
(a) A customer-generator's certificate to operate a net-metered facility shall transfer to the new owner when the property with the net-metered facility is sold or otherwise conveyed, if the new owner provides to the distribution utility in writing:
(1) Any information that is new or different from that provided in connection with the interconnection application as described in Puc 904.02; and
(2) An agreement to operate and maintain the net-metered facility according to Puc 900, RSA 362-A, and other applicable requirements.
(b) The distribution utility shall not deny a new owner acquiring a currently-registered net-metered facility, which otherwise complies with the requirements of Puc 900, the right to register, provided that the new owner complies with (a) above.
(c) The new customer-generator owner, as described in (a) and (b) above, shall notify the distribution utility of the transfer and of the applicable information required by the interconnection application as described in Puc 904.02.
(d) A net-metered facility transferred as described in this section shall not be deemed to have exited from the system, and neither Puc 903.02(q) nor Puc 903.02(r) shall apply to any such transfer.
(e) If any change or upgrade in a net-metered facility would otherwise require new approval pursuant to Puc 904.05, a mere transfer of ownership shall not relieve the customer-generator from that requirement.

N.H. Admin. Code § Puc 908.10

#7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09

New. #9515, eff 7-18-09 (formerly Puc 908.11); ss by #9998, eff 9-20-11 (from Puc 908.11 )

Amended by Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030