N.H. Admin. Code § Puc 908.07

Current through Register No. 50, December 12, 2024
Section Puc 908.07 - Utilities Shall Report Number and Size of Net-Metered Facilities
(a) Each distribution utility shall:
(1) Track the number and size of net-metered facilities interconnected to their distribution systems;
(2) Report to the commission annually by April 1 of each year for the prior year, the following information regarding net-metered facilities:
a. The number of facilities operating;
b. The generation output rating of the facilities in kilowatts; and
c. Information regarding any net-metered combined heat and power facilities.

N.H. Admin. Code § Puc 908.07

#7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09

New. #9515, eff 7-18-09; ss by #9998, eff 9-20-11

Amended by Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030