N.H. Admin. Code § Puc 908.01

Current through Register No. 50, December 12, 2024
Section Puc 908.01 - Emergencies and Maintenance
(a) The customer-generator shall, during the period it operates as a customer-generator, provide to the distribution utility a current telephone number(s) at which the customer-generator shall be contacted.
(b) The distribution utility shall make arrangements for routine utility repairs or inspections that might involve the net-metered facility during normal business hours.
(c) The customer-generator shall not export electricity to the electric distribution system during any outages of the distribution system that serves the customer-generator.
(d) The customer-generator's net-metered facility may be operated during outages referred to in (c) above only with an open tie to the distribution utility.
(e) The customer-generator's net-metered facility shall not:
(1) Create an islanding situation on the electric distribution system; or
(2) Energize a de-energized utility circuit for any reason.

N.H. Admin. Code § Puc 908.01

#7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09

New. #9515, eff 7-18-09; ss by #9998, eff 9-20-11

Amended by Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030