N.H. Admin. Code § Puc 902.28

Current through Register No. 50, December 12, 2024
Section Puc 902.28 - Witness Test

"Witness Test" means the process used by the electric distribution utility following the interconnection of a customer-generator's facility to determine whether the interconnection affects the safety, reliability, or power quality of the utility's distribution system.

N.H. Admin. Code § Puc 902.28

#10757, eff 1-8-15 (from Puc 902.19); Derived from Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030 (formerly Puc 902.28)