N.H. Admin. Code § Puc 507.01

Current through Register No. 50, December 12, 2024
Section Puc 507.01 - F-3 Statement of Pro Forma Income Statement at Present and Proposed Rates for Year Ended
(a) Each utility which requests a rate increase shall file Form F-3, available at www.puc.nh.gov, with the commission and the department.
(b) The utility shall include on the form the name of the utility filing the report.
(c) Utilities shall include on Form F-3 a breakdown of operating revenues and expenses for:
(1) Actual year ended and preceding 2 years;
(2) Adjustments and pro forma at present rates;
(3) Adjustments and pro forma at proposed rates with additional requirements; and
(4) Total requirements.
(d) Utilities shall include on Form F-3 a calculation of rate base and calculation of rate of return.
(e) Each utility requesting a rate increase shall also comply with the requirements of Puc 1600, tariffs and special contracts.
(f) The application shall be submitted with the signature, full name and title of the utility employee who supervised the preparation of the report, and date of signature.

N.H. Admin. Code § Puc 507.01

(See Revision Note at Chapter heading for Puc 500) #6445, eff 1-28-97; ss by #8259, eff 1-19-05; ss by #10334, eff 5-10-13

Amended by Number 45, Filed November 9, 2023, Proposed by #13794, Effective 10/25/2023, Expires 10/25/2033 (See Revision Note # 1 and Revision Note #2 at chapter heading for Puc 500).