Each utility shall on a quarterly basis complete a report of electric utility reliability measures on Form E-38 dated 12/2013 and available at the commission website at www.puc.nh.gov/forms, and file one signed original and one electronic copy with the commission.
N.H. Admin. Code § Puc 308.18