N.H. Admin. Code § Puc 302.19

Current through Register No. 50, December 12, 2024
Section Puc 302.19 - Power factor load

"Power factor load" means the meter accuracy test point at rated test voltage, rated test current and 0.5 lagging power factor.

N.H. Admin. Code § Puc 302.19

Amended by byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10603, Effective 5/21/2014, Expires5/21/2024 .