N.H. Admin. Code § Puc 2004.12

Current through Register No. 50, December 12, 2024
Section Puc 2004.12 - Off-Cycle Meter Reading
(a) In the event of non-payment by a customer in the largest commercial and industrial classification as defined in the utility tariff, a CEPS shall be permitted to request an off-cycle meter reading by the utility for that customer.
(b) A CEPS shall provide no less than 3 business days' prior notice to the utility when requesting an off-cycle meter reading pursuant to (a) above.
(c) An off-cycle meter reading requested pursuant to (a) above shall be subject to such charge for performing off-cycle meter readings as is specified in the utility's tariff.
(d) A utility may deny a request for an off-cycle meter reading if timely notice as described in (b) above is not provided.
(e) To the extent a utility cannot accommodate an off-cycle meter reading requested in accordance with (a) above within 3 business days of the request, the utility and CEPS shall negotiate an extension of time for the completion of the off-cycle meter reading requested by the CEPS.

N.H. Admin. Code § Puc 2004.12

Derived From Volume XXXVII Number 37, Filed September 14, 2017, Proposed by #12372, Effective 11/1/2017, Expires 11/1/2027.