N.H. Admin. Code § Puc 2003.04

Current through Register No. 45, November 7, 2024
Section Puc 2003.04 - Reporting Requirements of Competitive Electric Power Suppliers
(a) No later than January 31, April 30, July 31 and October 31 of each year, each CEPS shall submit a confidential quarterly sales report containing the information specified in Puc 2006.03.
(b) The report required in (a) above shall be provided on a confidential basis to the Office of Consumer Advocate.
(c) Each CEPS shall file, by July 1 of each year, the Annual Renewable Portfolio Standard Compliance Filing required by Puc 2503.03.
(d) Each CEPS shall pay to the commission, by July 1 of each year, any alternative compliance payment due pursuant to Puc 2503.

N.H. Admin. Code § Puc 2003.04

#9774-A, eff 8-26-10 (from Puc 2003.02 )

Amended by Volume XXXVII Number 37, Filed September 14, 2017, Proposed by #12372, Effective 11/1/2017, Expires 11/1/2027.