N.H. Admin. Code § Puc 1203.04

Current through Register No. 45, November 7, 2024
Section Puc 1203.04 - Meter Reading
(a) Utilities which use meters shall read all service meters at regular intervals and on the corresponding day of each meter reading period insofar as practicable within regularly scheduled work days.
(b) Specific rules regarding meter readings for the utilities shall be found in Puc 300 for electric utilities, Puc 500 for gas utilities, and Puc 600 for water utilities.

N.H. Admin. Code § Puc 1203.04

#6245, eff 5-14-96; ss by #8075, INTERIM, eff 4-29-04, EXPIRES: 10-26-04; ss by #8192, eff 10-22-04; ss by #9990, eff 9-16-11

Amended by Volume XL Number 19, Filed May 7, 2020, Proposed by #13031, Effective 6/9/2020, Expires 6/9/2030.