N.H. Admin. Code § Pas 305.06

Current through Register No. 50, December 12, 2024
Section Pas 305.06 - Seven-Year Dynamic Testing
(a) All aerial tramways shall be dynamically tested every 7 years. A state inspector or designee of the board shall witness the test.
(b) A written procedure prepared by the manufacturer or a qualified engineer reflecting the latest modifications to each lift shall be used as part of the testing.
(c) The following materials shall be available for the inspection:
(1) The as-built documentation for mechanical equipment, electrical system, tower loadings geometry, and tensioning system; and
(2) A copy of the last load test or periodic dynamic test with recorded parameters for comparison.
(d) The written procedure for the dynamic test shall include, at a minimum:
(1) Testing for proper functioning of all electrical safety switches, including but not limited to:
a. Line tower and lift terminal deropement switches;
b. Manual stop, start and slow switches;
c. Tension system limit switches for mechanical travel and for pressure limits;
d. Collision control switches and systems;
e. Brake monitoring switches;
f. Overspeed devices;
g. Field loss and phase loss detection, as appropriate;
h. Brake trip switches; and
i. Speed control circuit loss detectors;
(2) Verification of basic design parameters, including:
a. Lift speed;
b. Carrier spacing;
c. Tensioning values;
d. Line geometry, such as the general conformance to design drawings;
e. Capacity and torque value of all brakes;
f. Quantity and condition of line sheaves;
g. Lift acceleration and deceleration rates; and
h. Carrier weights, configurations, and condition;
(3) A suitable load test to verify that the following devices are functioning properly for all loading conditions, such as uphill, downhill and simultaneous uphill and downhill loading:
a. Prime mover system;
b. Auxiliary drive system;
c. Evacuation drive system; and
d. All braking systems in each mode of design operation.
(e) For the purposes of (d)(2)d. above, a survey shall not be required unless an apparent discrepancy exists between field observations and existing as-built drawings.

N.H. Admin. Code § Pas 305.06

#7800, eff 12-11-02; amd by #9354-B eff 1-3-09; EXPIRED: 12-11-10, except for para (f); ss by #10072, eff 1-11-12; amd by #10382, eff 7-23-13

Amended by Volume XL Number 7, Filed February 13, 2020, Proposed by #12989, Effective 2/5/2020, Expires 2/5/2030.