Unless RSA 275-F:4 and Lab 1704.01 apply, notice shall be given at least 60 days prior to any planned plant closing or mass layoff, and the information in the notice shall be based on the best information available to the employer at the time the notice is issued.
N.H. Admin. Code § Lab 1703.02