N.H. Admin. Code § He-P 4035.45

Current through Register No. 50, December 12, 2024
Section He-P 4035.45 - Surveys After Source Implant/Removal and Surveys of Individuals Treated With a Remote Afterloader Unit
(a) Immediately after implanting sources in a patient or a human research subject, the licensee shall make a survey to locate and account for all sources that have not been implanted.
(b) Immediately after removing the last temporary implant source from a patient or a human research subject, the licensee shall make a survey of the patient or the human research subject with a radiation detection survey instrument to confirm that all sources have been removed.
(c) Before releasing a patient or a human research subject from license control, a licensee shall survey the patient or the human research subject and the remote afterloader unit with a portable radiation detection survey instrument to confirm that the source(s) has been removed from the patient or human research subject and returned to the safe shielded position.
(d) A licensee shall maintain a record of patient or human research subject surveys which demonstrate compliance with He-P 4035.45(a) through (c) for 3 years, including the date and the results of the survey, the survey instrument used, and the name of the individual who made the survey.

N.H. Admin. Code § He-P 4035.45

(See Revision Note at part heading for He-P 4035) #6942, eff 2-1-99; ss by #8800, INTERIM, eff 2-1-07, EXPIRED: 7-31-07

New. #8959, eff 8-7-07

Amended by Volume XXXV, Number 32 Filed August 13, 2015, Proposed by #10897, Effective 7/22/2015, Expires1/18/2016.
Amended by Volume XXXVI Number 01, Filed January 7, 2016, Proposed by #11011, Effective 1/15/2016, Expires 1/15/2026.
Amended by Volume XLII Number 45, Filed November 10, 2022, Proposed by #13473, Effective 10/25/2022, Expires 10/25/2032