"Sequential dredging" means the process of timing and conducting a dredge project in specified order, in a horizontal or vertical direction, or both, in order to address environmental conditions that include but are not limited to the tide cycle, the presence and activity level of fish and wildlife, and weather conditions, to minimize the biological impact on the natural resources present within the subject system.
N.H. Admin. Code § Env-Wt 602.47