Current through Register No. 50, December 12, 2024
Section Env-Wt 527.03 - Application Requirements for Public Highway Projects The project-specific information required by Env-Wt 310.01(c)(1) or Env-Wt 311.03(b)(11), as applicable, for a C/M project shall be as follows:
(a) A description of the scope of the project, the size of the impacts to aquatic resources, and the purpose of the project; (b) An accurate drawing with existing and proposed structure dimensions clearly annotated to:(1) Document existing site conditions;(2) Detail the precise location of the project and show the impact of the proposed activity on jurisdictional areas; (3) Show existing and proposed contours at 2-foot intervals;(4) Show existing and proposed structure invert elevations on the plans; and(5) Use a scale based on standard measures of whole units, such as an engineering rule of one to 10, provided that if plans are not printed at full scale, a secondary scale shall be noted on the plans that identifies the half scale unit of measurement;(c) All easements and right-of-way acquisition area outlines in relation to the project;(d) The name of the professional engineer who developed the plans, whether an employee of the applicant or at a consulting firm; and(e) An erosion control plan that shows:(1) Existing and proposed contours at 2-foot intervals, with existing contours shown with a lighter line weight and proposed contours shown with a heavier line weight such as a bold font; and(2) The outermost limit of all work areas, including temporary phasing work, with perimeter controls.N.H. Admin. Code § Env-Wt 527.03
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.