Current through Register No. 50, December 12, 2024
Section Env-Wt 521.04 - Utility Project Application Requirements The project-specific information required by Env-Wt 310.01(c)(1) or Env-Wt 311.03(b)(11), as applicable, for a utility project shall be as follows:
(a) A plan showing the following: (1) The extent and location of all wetlands and watercourses within the project area;(2) A wetland delineation, functional assessment, and impact analysis in accordance with Env-Wt 300;(3) The location of any existing utility corridors and facilities;(4) The location of the proposed utility corridors and facilities; and(5) The location of any proposed impacts, crossings, construction areas, and clearings;(b) A recent aerial photograph of the project area overlain by the items specified in (a)(1), above;(c) A description of the methods, techniques, vehicles, and equipment proposed to access and conduct the project;(d) An invasive species control plan;(e) A description of measures proposed to minimize and avoid impacts to wetlands and surface waters;(f) A construction sequence plan describing measures proposed to minimize impacts to water quality, impacts to nesting and breeding species, and to prevent compaction of wetlands soils; and(g) The locations of staging areas, off right-of-way access roads, temporary access roads, and new station locations.N.H. Admin. Code § Env-Wt 521.04
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.Amended by Volume XL Number 46, Filed November 12, 2020, Proposed by #13124, Effective 10/23/2020, Expires 10/23/2030.