N.H. Admin. Code § Env-Wt 517.04

Current through Register No. 45, November 7, 2024
Section Env-Wt 517.04 - Design and Construction Requirements for Trail and Pathway Projects

A proposed trail or pathway project shall be designed and constructed to:

(a) Use existing structures and pathways wherever practicable;
(b) Maintain pathways no more than 20 feet wide; and
(c) For trails, comply with the Trail BMPs, available as noted in Appendix B.

N.H. Admin. Code § Env-Wt 517.04

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.
Amended by Volume XL Number 2, Filed January 9, 2020, Proposed by #12953, Effective 12/24/2019, Expires 12/24/2029.