N.H. Admin. Code § Env-Wt 517.02

Current through Register No. 45, November 7, 2024
Section Env-Wt 517.02 - Approval Criteria for Trail, Pathway, and Boardwalk Projects

In addition to meeting the applicable criteria established in Env-Wt 300, the department shall not approve an application for a trail, pathway, or boardwalk project unless the following criteria are met:

(a) The project:
(1) Avoids and minimizes impacts in accordance with Env-Wt 313.03;
(2) Is located away from lakes, rivers, river banks, tidal waters, marshes, and scrub-shrub wetlands to the greatest extent practicable, unless Env-Wt 517.06(a)(6) applies; and
(3) Will be conducted in accordance with the Trail BMPs, available as noted in Appendix B; and
(b) For coastal boardwalk projects:
(1) The project is located at municipal, county, state, or federally owned facilities only; and
(2) The design is consistent with Env-Wt 600 and RSA 482-A:1.

N.H. Admin. Code § Env-Wt 517.02

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.