Section Env-Wt 513.13 - Concrete Pads for Seasonal Docking StructuresAny concrete pad installed to anchor a seasonal pier shall:
(a) Be not more than 7 feet wide as measured along the shoreline;(b) Not be in prime wetlands or a duly-established 100-foot buffer;(c) Designed such that any adjacent bank stabilization, such as gravel or rip-rap, will not cause the total impact of the pad to exceed 10 LF along the bank;(d) For a concrete pad on a pond or lake, be constructed landward of the normal high water line; and(e) For a concrete pad on a watercourse, installed completely landward of the ordinary high water line.N.H. Admin. Code § Env-Wt 513.13
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.