Current through Register No. 45, November 7, 2024
Section Env-Wt 512.05 - Breakwater Construction Requirements In addition to meeting all applicable construction standards established in Env-Wt 307, the following shall apply to breakwater construction projects:
(a) The breakwater shall be constructed as shown in the approved plans and specifications;(b) No rocks shall be stockpiled in any jurisdictional area unless the applicant: (1) Specifically requests authorization for such stockpiling in the application and receives such authorization in the permit; and(2) Documents in the application that the limited and difficult access to the site precludes stockpiling outside of jurisdictional areas;(c) Any rocks stockpiled in jurisdictional areas shall be removed:(1) As soon as practicable; and(2) In every case, by the conclusion of construction on the breakwater; and(d) Rocks from the frontage of the subject property shall be used as a source of breakwater material only if: (1) The applicant specifically requests authorization for such use in the application and receives such authorization in the permit; and(2) The rocks are removed from another structure on the frontage for the purpose of constructing the breakwater and are not dug or blasted out of the ground.N.H. Admin. Code § Env-Wt 512.05
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.