N.H. Admin. Code § Env-Ws 372.34

Current through Register No. 45, November 7, 2024
Section Env-Ws 372.34 - Final Inspection
(a) All small community water systems and those NTNC water systems important to public health as specified in Env-Ws 372.02(g) shall comply with this section.
(b) Upon completion of the construction of a public water system but before any service is offered, the department shall conduct a sanitary survey, or inspection, of the water system. This inspection shall be performed within 5 working days after notification by the owner of the proposed water system that construction, including all required testing, is complete. The water system shall not be approved for any service unless this inspection is completed.
(c) The proposed operator for a new public water system shall:
(1) Have taken or arranged to take the operator certification exam as required under Env-Ws 367; and
(2) Be in attendance at this inspection.

N.H. Admin. Code § Env-Ws 372.34

#8496, eff 11-30-05 (formerly Env-Ws 372.29 )