N.H. Admin. Code § Env-Ws 343.04

Current through Register No. 50, December 12, 2024
Section Env-Ws 343.04 - Consideration of an Exemption Request
(a) The department shall act on any exemption request within 90 days of receipt of a complete request.
(b) In its consideration of whether the public water system is unable to comply due to compelling factors, the department shall consider such factors as the following:
(1) Construction, installation, or modification of the treatment equipment or systems;
(2) The time needed to put into operation a new treatment facility or to replace an existing system which is not in compliance; and
(3) The economic feasibility of compliance.

N.H. Admin. Code § Env-Ws 343.04

(See Revision Note at chapter heading Env-Ws 300) #6521, eff 6-4-97; ss by #8360, INTERIM, eff 6-4-05, EXPIRES: 12 -1-05 ; ss by #8497, eff 11-30-05 (formerly Env-Ws 343.12 )