Current through Register No. 50, December 12, 2024
Section Env-Ws 342.06 - Proposed Schedules for Compliance and Control Measures(a) For a variance requested under Env-Ws 342.01(a), the department shall propose a schedule for:(1) Compliance, including increments of progress, by the public water system with each contaminant level requirement covered by the variance; and(2) Implementation by the public water system of such additional control measures as the department shall require for each contaminant covered by the variance.(b) The proposed schedule for compliance shall specify dates by which steps towards compliance are to be taken, including, at aminimum, where applicable: (1) The date by which the arrangement for an alternative raw water source or improvement of existing raw water source shall be completed;(2) The date of initiation of the connection for the alternative raw water source or improvement of the existing raw water source; and(3) The date by which final compliance shall be achieved.(c) The proposed schedule shall, if the public water system has no access to an alternative raw water source and can effect or anticipate no adequate improvement of the existing raw water source, specify an indefinite time period for compliance until a new and effective treatment technology is developed at which time a new compliance schedule shall be prescribed by the department.(d) The proposed schedule for implementation of additional interim control measures during the period of variance shall specify interim treatment techniques, methods and equipment, and dates by which steps toward meeting the additional interim control measures shall be met.(e) The final schedule shall be established by the department at the time of granting the variance, subsequent to the opportunity for hearing pursuant to Env-Ws 342.07.N.H. Admin. Code § Env-Ws 342.06
(See Revision Note at chapter heading Env-Ws 300) #6521, eff 6-4-97; ss by #8360, INTERIM, eff 6-4-05, EXPIRES: 12 -1-05 ; ss by #8497, eff 11-30-05