Current through Register No. 50, December 12, 2024
Section Env-Ws 308.10 - Long-Term Use of POU Treatment(a) The long-term acceptability of POU treatment shall be judged by an annual review of the system's level of compliance.(b) The department shall assess the level of non-compliance of POU systems annuallyusing the following schedule of deficiency points: (1) For an MCL violation, 5 deficiency points per device shall be assigned;(2) For failure to maintain devices, 3 deficiency points per device shall be assigned;(3) For failure to monitor water quality, 3 deficiency points per device shall be assigned; and(4) For failure to provide educational notice, 3 deficiency points per device shall be assigned.(c) If a system accumulates 20 or more deficiency points in a running 3-year period, the department shall initiate a proceeding under the provisions of Env-C 200 relative to adjudicative proceedings to revoke the POU conceptual approval and require the system to install full scale treatment.N.H. Admin. Code § Env-Ws 308.10
(See Revision Note at chapter heading Env-Ws 300); ss by #8498, eff 11-30-05