N.H. Admin. Code § Env-Wq 807.10

Current through Register No. 50, December 12, 2024
Section Env-Wq 807.10 - Soil Testing
(a) One soil test pit or auger boring shall be taken, at a depth of at least 40 inches, for each soil mapping unit present on the NRCS county soils map, but no less than one every 5 acres.
(b) One soil test pit or auger boring shall be taken, to a depth of at least 6 feet, for each area proposed for storage.
(c) An analysis of the soil test pits or auger borings required by (a) and (b), above, shall be performed and shall include a description of the soil profile characteristics, depth to the seasonal high water table, and bedrock.

N.H. Admin. Code § Env-Wq 807.10

Adopted by Volume XXXVI Number 01, Filed January 7, 2016, Proposed by #10998, Effective 1/1/2016, Expires 1/1/2026.