N.H. Admin. Code § Env-Wq 707.08

Current through Register No. 50, December 12, 2024
Section Env-Wq 707.08 - Meetings Required
(a) The owner and design engineer shall meet with department review staff:
(1) At or prior to project initiation for the purpose of outlining project scope and goals; and
(2) Upon completion of the basis of design report for the purpose of reviewing report recommendations, department comments on the report, and project progression plans.
(b) If one or more meetings with the department in addition to those included in the project schedule are considered necessary for the project progression by the owner and design engineer, the design engineer shall contact department review staff to schedule such meeting(s).

N.H. Admin. Code § Env-Wq 707.08

Adopted byVolume XXXIV Number 46, Filed November 13, 2014, Proposed by #10693, Effective 10/15/2014, Expires10/15/2024.