Current through Register No. 50, December 12, 2024
Section Env-Wq 510.04 - Bidding Requirements Recipients of state or federal funds for projects covered under §211 or 212 of the CWA shall comply with the following bidding requirements:
(a) The bid period shall be not less than 30 calendar days;(b) The advertisement for bids shall include the following information as commensurate with the nature and magnitude of the project:(1) The project name and contract number;(2) The location of work;(3) A description of work to be performed;(4) The names and addresses of persons receiving bids;(5) The time and date at which the bids will be publicly opened and read aloud, and a statement that bids received after that time will not be accepted;(6) An address and cost information for obtaining plans and specifications; and(7) The addresses where plans and specifications can be examined.(c) A bid security in the amount of 5% of the bid shall be required in the form of a certified check or a bid bond executed by a surety company authorized to do business in New Hampshire and made payable to the recipient;(d) A 100% performance bond and a 100% payment bond shall be required;(e) The recipient shall reserve the right to: (1) Reject any or all bids;(3) Waive any informalities or minor defects on bids received; and(4) Omit any bid item; and(f) If any addenda to the bid are needed, the recipient shall: (1) Submit the proposed addenda to the department for review as much in advance of issuing it as possible;(2) Refrain from issuing the addenda without approval from the department; and(3) Issue the approved addenda no less than 5 days prior to bid opening.N.H. Admin. Code § Env-Wq 510.04
(See Revision Note #2 at chapter heading for Env-Wq 500) #9394, INTERIM, eff 3-1-09, EXPIRES: 8-28-09; ss by #9531, eff 8-26-09
Amended by Volume XXXV Number 49, Filed December 10, 2015, Proposed by #10984, Effective 12/1/2015, Expires12/1/2025.Amended by Number 2, Filed January 12, 2023, Proposed by #13511, Effective 12/20/2022, Expires 12/20/2032.