N.H. Admin. Code § Env-Wq 2101.09

Current through Register No. 49, December 5, 2024
Section Env-Wq 2101.09 - Development and Implementation of Response Plans
(a) If the water balance calculated pursuant to Env-Wq 2101.08(a) exceeds 15% of the system input volume, the owner of a conservation system shall:
(1) Complete a water audit using protocols and procedures described in the 2009 AWWA M36 Manual;
(2) Prepare a response plan based on the findings of the water audit; and
(3) Submit the water audit and the response plan to the department with the water balance required by Env-Wq 2101.08.
(b) The response plan prepared pursuant to (a)(2), above, shall identify the measures the owner intends to implement and the schedule on which such measures will be implemented to reduce the water balance to below 15% within 2 years.
(c) The department shall approve the response plan within 90 days if the department agrees that the measures identified in the plan are likely to meet the reduction requirements specified in (b), above.
(d) The department shall include in its approval such conditions as are required to ensure the response plan is implemented as required, including but not limited to requirements for interim progress reports.
(e) The owner shall implement the response plan as approved by the department in accordance with the approved schedule upon receiving approval from the department.

N.H. Admin. Code § Env-Wq 2101.09

#8353, eff 5-14-05 (See Revision Note at part heading for Env-Wq 2101) (formerly Env-Ws 390.09); ss by #10480-A, eff 12-3-13