N.H. Admin. Code § Env-Wq 1103.06

Current through Register No. 50, December 12, 2024
Section Env-Wq 1103.06 - PBF Application: Required Plans and Specifications

The plans and specifications required by Env-Wq 1103.02(a)(2) shall:

(a) Be prepared or reviewed by a professional engineer licensed in the state of New Hampshire pursuant to RSA 310-A to confirm compliance with the design requirements of Env-Wq 1100;
(b) Be stamped by the engineer who prepared or reviewed them, which stamp shall serve to certify that the pool shown on the plans complies with the design requirements of Env-Wq 1100; and
(c) Include:
(1) A plan to scale of the layout of buildings, pool(s), spa(s), deck area, rest rooms, showers, equipment room, and location of backflow prevention and water supply;
(2) A plan to scale of the pool or spa showing all dimensions, ladders, slides, stairs, underwater shelves, benches, lights, and shut-off switches;
(3) A longitudinal section to scale of the entire pool or spa and a cross-section to scale of the deep end showing dimensions, depths, and slopes;
(4) A detailed schematic of the entire PBF piping system, with all pipe diameters shown and all piping labeled and marked to indicate the direction of water flow. including:
a. The size, location, and material of piping;
b. Configuration of wall and floor inlets, skimmers, and perimeter overflows;
c. Submerged suction outlets;
d. Surge, balance, or collection tanks;
e. Vacuum lines;
f. Hydrotherapy jets;
g. Fill spout;
h. Deck drains; and
e. Wastewater disposal;
(5) A detailed layout or schematic of the equipment room showing the location, size, material, and configuration of all exposed piping, all pumps, all filter and disinfection system components, heaters, valves, manifolds, gauges, meters, anti-entrapment devices, and all other appurtenances as applicable, with all components labeled, pipe diameters noted, and all piping labeled and marked to indicate direction of water flow.
(6) Cut sheets for all equipment showing that all components are certified to NSF/ANSI 50 requirements as required by Env-Wq 1108.22(a)(1);
(7) Specifications of the pump, including a pump performance curve showing gallons per minute versus total dynamic head to show that the maximum flow rate of the pump allowing for total dynamic head does not exceed the rating of the main drain cover/grate;
(8) Specifications of the filtration components, disinfection components including automated controllers, and anti-entrapment system components; and
(9) Documentation showing that the discharge site for any outdoor shower or filter backwash discharge is approved by the department as required by Env-Wq 1109.07(g).

N.H. Admin. Code § Env-Wq 1103.06

(See Revision Note #1 at chapter heading for Env-Wq 1100) #8468, eff 11-1-05; ss by #10577, eff 5-1-14 (See Revision Note #2 at chapter heading for Env-Wq 1100)

Amended by Volume XLI Number 19, Filed May 13, 2021, Proposed by #13198, Effective 5/1/2021, Expires 5/1/2031 (see Revision Note #3 at chapter heading for Env-Wq 1100)