Current through Register No. 50, December 12, 2024
Section Env-Wq 1019.04 - Application Requirements The following shall appear on or with all plans and specifications for pressure distribution systems submitted for review:
(b) All details for network layout;(c) Pump/pump station or siphon details;(d) Network drainage to avoid freezing potential;(e) All construction methods for basal area preparation; and(f) Inspection/construction requirements as follows:(1) "Basal area preparation to be inspected by system designer prior to fill placement. An inspection report shall be submitted to the regional inspector at the time of final inspection.";(2) "Caution to be exercised during fill placement/site preparation to avoid compaction or smearing of infiltrative surface."; and(3) "Maintain 8-12 inches of fill between equipment tracks and prepared surface."N.H. Admin. Code § Env-Wq 1019.04
(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08
Amended by Volume XXXVI Number 41, Filed October 13, 2016, Proposed by #11184, Effective 10/1/2016, Expires 10/1/2026.