N.H. Admin. Code § Env-Wq 1016.03

Current through Register No. 50, December 12, 2024
Section Env-Wq 1016.03 - Excavation

Any person excavating for an EDA shall:

(a) Protect the natural absorption qualities of the soil;
(b) Protect open excavation from storm runoff to prevent the entrance of silt and debris;
(c) Rake all smeared or compacted surfaces to a depth of one inch; and
(d) Remove loose material before the fill or uniform crushed stone is placed or, in the case of chambers or LDGP systems, the sand layer is constructed.

N.H. Admin. Code § Env-Wq 1016.03

(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08

Amended by Volume XXXVI Number 41, Filed October 13, 2016, Proposed by #11184, Effective 10/1/2016, Expires 10/1/2026.