N.H. Admin. Code § Env-Sw 315.03

Current through Register No. 45, November 7, 2024
Section Env-Sw 315.03 - Approval Required
(a) Before making a modification to the design, construction, operation or closure of a facility as permitted by the department, the permittee shall obtain written approval for such modification in accordance with this part.
(b) A permittee shall request approval to implement a facility modification by filing an application for permit modification as follows:
(1) For a type I modification, the permittee shall submit an application that provides the information specified in Env-Sw 315.05;
(2) For a type II modification, the permittee shall submit an application that provides the information specified in Env-Sw 315.06;
(3) For a type III modification, the permittee shall submit an application in the form of a notification that provides information specified in Env-Sw 315.07;
(4) For a type IV modification, the existing permittee and proposed new permittee shall be co-applicants and shall submit an application that provides the information specified in Env-Sw 315.08; and
(5) For a type V modification, the permittee shall submit an application that provides information as specified in Env-Sw 315.09.

N.H. Admin. Code § Env-Sw 315.03

(see Revision Note at chapter heading for Env-Sw 300) #8462-B, eff 10-28-05

Amended byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10595, Effective 7/1/2014, Expires7/1/2024.