Section Env-Or 408.02 - Repair of Tanks: Post-Repair Requirements(a) Following repairs to the tank and prior to adding regulated substance, the owner shall submit to the department a report that includes: (1) An explanation of the cause and location of the failure;(2) A description of the procedure that was followed to return the interstitial space to its original operating condition;(3) Documentation from the tank manufacturer certifying the repair; and(4) The name and daytime telephone number including area code of the certified tank installer who performed the repair.(b) Within 30 days of the repair and prior to adding regulated substance, the tank shall be tightness tested in accordance with Env-Or 406.05 through Env-Or 406.08.(c) The owner shall submit all reports and documents describing the types of the tests, contractor, date, materials, all technical testing data and any other information pertinent to the work performed, as required by (b), above, to the department no later than 30 day after the test.N.H. Admin. Code § Env-Or 408.02
(See Revision Note at chapter heading for Env-Or 400) #10393, eff 9-1-13
Amended by Volume XXXVIII Number 45, Filed November 8, 2018, Proposed by #12643, Effective 10/10/2018, Expires 10/10/2028.