Current through Register No. 45, November 7, 2024
Section Env-Or 407.08 - Installation Testing Requirements(a) The certified tank installer shall perform a tightness test of the primary piping, secondary containment piping, vent piping, containment sumps, and all spill containment equipment after installation and prior to backfill to determine tightness in accordance with Env-Or 406.05 through Env-Or 406.08.(b) If no manufacturer's test requirements are specified for the primary piping or vent piping, the certified tank installer shall perform the piping pressure test in accordance with API RP 1615.(c) Prior to backfilling the system, the certified tank installer shall: (1) Certify the results of all tightness testing performed; and(2) Provide the certified results to the department and the owner at the time of the inspection of the system as specified in Env-Or 407.07.(d) All line leak detectors shall be tested in accordance with the manufacturer's requirements.(e) The certified tank installer shall: (1) Certify that: a. All line leak detectors passed a functionality test;b. All overfill devices passed a functionality test;c. All spill containment passed integrity testing;d. All containment sumps passed integrity testing;e. All leak monitoring system components pass a functionality test; andf. All motor fuel dispensing tank systems passed primary containment testing; and(2) Submit the certified test results to the department before any regulated substance is dispensed or used for consumption, as applicable.N.H. Admin. Code § Env-Or 407.08
(See Revision Note at chapter heading for Env-Or 400) #10393, eff 9-1-13
Amended by Volume XXXVIII Number 45, Filed November 8, 2018, Proposed by #12643, Effective 10/10/2018, Expires 10/10/2028.