Current through Register No. 50, December 12, 2024
Section Env-Or 406.10 - Cathodic Protection System Testing(a) The owner shall test:(1) Sacrificial anode systems within 6 months of installation and every 3 years thereafter; and(2) Impressed current systems within 6 months of installation and every 3 years thereafter.(b) The individual conducting the testing shall be a cathodic protection tester.(c) The owner shall submit the following information in a report of the cathodic protection test generated by the owner, on a form made available by the department, or any other document: (1) The information required by Env-Or 406.07(c)(1)-(6);(2) A description of the equipment used to conduct the test;(5) For impressed current systems, the specified rectifier DC output range in volts and amps; and(6) The tester's International Code Council, Steel Tank Institute, or NACE certification number.(d) The cathodic protection tester who has conducted the test shall sign the test report in accordance with Env-Or 406.07(e).(e) When a cathodic protection test is performed, the owner shall send the test report to the department no later than 30 days after the date of the test.N.H. Admin. Code § Env-Or 406.10
(See Revision Note at chapter heading for Env-Or 400) #10393, eff 9-1-13
Amended by Volume XXXVIII Number 45, Filed November 8, 2018, Proposed by #12643, Effective 10/10/2018, Expires 10/10/2028.