Current through Register No. 50, December 12, 2024
Section Env-Or 309.04 - Temporary Construction AST Systems(a) The owner of an AST system included in Env-Or 309.01(c) (temporary construction AST system) shall:(1) Register the temporary construction AST system as specified in Env-Or 304.01; and(2) Include the contract start and completion dates in the registration information.(b) A temporary construction AST system shall:(1) Be marked as specified in Env-Or 305.03;(2) Have secondary containment as specified in Env-Or 305.07;(3) Be equipped with a gauge as specified in Env-Or 305.11(a); and(4) Be equipped with either a high level warning alarm as specified in Env-Or 305.11(b) or a mechanically operated automatic fill shut-off valve as specified in Env-Or 305.08(h)(3).N.H. Admin. Code § Env-Or 309.04
(See Revision Note at chapter heading for Env-Or 300) #10487, eff 2-7-14