Current through Register No. 50, December 12, 2024
Section Env-Hw 304.10 - Permit Application Process(a) Before beginning construction or operation of a new facility, including a presently operating non-hazardous waste facility that proposes to treat, store, or dispose of hazardous waste on-site, the operator shall: (1) Submit a standard permit or transfer facility permit application signed in accordance with (d), below, that contains the information required in Env-Hw 304.11 and, as applicable, Env-Hw 304.18; and(2) Obtain a standard permit or transfer facility permit from the department.(b) The operator of an existing facility shall submit a complete standard permit or transfer facility permit application, signed in accordance with (d), below, to the department no later than 12 months from the date that the department receives the interim status part A application from the facility, unless subject to an earlier deadline as provided in Env-Hw 304.02(h).(c) Existing facilities that do not qualify for interim status shall submit a standard permit or transfer facility permit application to the department immediately upon becoming subject to the standards in Env-Hw 700.(d) Signatory requirements shall be as set forth in 40 CFR 270.11.N.H. Admin. Code § Env-Hw 304.10
(See Revision Note at chapter heading for Env-Hw 300) #9362, eff 1-28-09
Amended by Volume XXXVII Number 32, Filed August 10, 2017, Proposed by #12345, Effective 8/14/2017, Expires 8/14/2027.