N.H. Admin. Code § Env-Dw 723.09

Current through Register No. 50, December 12, 2024
Section Env-Dw 723.09 - POE and POU Monitoring Requirements
(a) Unless otherwise specified in the treatment approval, the system owner shall collect a sample of treated water and have the sample tested for the contaminant(s) from each POE or POU device:
(1) Within 6 months of initial installation; and
(2) Annually thereafter as specified in the system's sampling schedule provided by the department in accordance with Env-Dw 708.
(b) If any result from any POE or POU device exceeds the MCL for the contaminant being treated, the system owner shall submit flow and maintenance records and results from all devices installed at that PWS to the department to collaboratively determine the frequency of subsequent monitoring of that unit.
(c) Compliance shall be determined for each unit based on the running annual average of results from samples collected at each POE or POU device.

N.H. Admin. Code § Env-Dw 723.09

Adopted byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10618, Effective 6/1/2014, Expires6/1/2024.