Current through Register No. 50, December 12, 2024
Section Env-Dw 602.06 - Description of Financial Capacity The description of the financial capabilities of the supplier of water required by Env-Dw 602.03(a)(4) shall include:
(a) Final construction costs for all water system infrastructure and water source development, excluding costs attributable to land acquisition;(b) A projection of the annual expenses of operating the PWS over a minimum 5-year planning horizon, using generally accepted accounting principles, including: (1) The fee required by RSA 485:41, VIII for a permit to operate and other applicable state and federal taxes and fees;(3) Annual debt repayment, including principal and interest or rate of return where applicable;(4) Annual funding of an operation and maintenance account for general repair or replacement of existing facilities and for any new phases of development; and(5) A list of water system operation and maintenance expenses including: c. Water treatment chemicals;d. Disposal costs for water treatment residuals;e. Certified operator and other contracted staff;f. Compliance and other water quality testing;h. Leak detection surveys and repairs, andi. Other operational costs; and(c) Projected water rates, the rate structure, and the fee schedule for the entire 5-year planning period, including: (1) Type of rate structure, for example, increasing block rate to encourage water conservation and, for a CWS, not less than quarterly billing frequency per Env-Wq 2101;(3) Disconnect and activation charges;(4) Hydrant and fire sprinkler charges;(6) Backflow prevention device permits and testing charges;(7) Water service line insurance; and(8) Other charges including interest, equipment rental fees, and inspection fees.N.H. Admin. Code § Env-Dw 602.06
(See Revision Note at chapter heading for Env-Dw 600) #9108, eff 3-23-08 (formerly Env-Ws 371.20 -371.23)
Amended by Volume XXXVI Number 32, Filed August 11, 2016, Proposed by #11143, Effective 7/26/2016, Expires 7/26/2026.