Current through Register No. 50, December 12, 2024
Section Env-Dw 305.04 - Pre-Approval Required(a) A person shall obtain approval from the department in accordance with Env-Dw 305.05 through Env-Dw 305.29 prior to: (1) Connecting a new small production well to a small CWS; or(2) Requesting an increase in the permitted production volume of an existing small production well currently connected to a small CWS, provided the increase will not result in a permitted production volume of equal to or greater than 57,600 gallons in a 24-hour period.(b) Prior to hydrofracturing or deepening an existing small bedrock production well to regain lost well capacity, the applicant shall: (1) Submit a request to the department in accordance with Env-Dw 305.33; and(2) Comply with (a), above, if the department denies the request submitted pursuant to Env-Dw 305.33.(c) Prior to replacing an existing small production well with a new small production well, the applicant shall submit a request to the department in accordance with Env-Dw 305.34 and Env-Dw 305.35.N.H. Admin. Code § Env-Dw 305.04
Adopted by, Volume XXXVI Number 14, Filed April 7, 2016, Proposed by #11062, Effective 4/1/2016, Expires 4/1/2026.