N.H. Admin. Code § Env-Dw 302.04

Current through Register No. 50, December 12, 2024
Section Env-Dw 302.04 - Pre-Approval Required
(a) A person shall obtain approval from the department in accordance with Env-Dw 302.05 through Env-Dw 302.31 prior to:
(1) Developing a new production well for a large CWS, regardless of whether the well is a small production well or a large production well;
(2) Requesting an increase in the permitted production volume of an existing well currently connected to a large CWS; or
(3) Requesting an increase in the permitted production volume of an existing small production well connected to any CWS if the increase would result in a permitted production volume of equal to or greater than 57,600 gallons in a 24-hour period.
(b) Any person proposing to construct a back-up production well for a large CWS and any person proposing to construct a back-up well for a small CWS where the well would qualify as a large production well shall submit a request to the department in accordance with Env-Dw 302.34.
(c) Any person proposing to replace a large production well shall submit a request to the department in accordance with Env-Dw 302.35.

N.H. Admin. Code § Env-Dw 302.04

(See Revision Note at part heading for Env-Dw 302) #9008, eff 10-19-07

Amended by, Volume XXXVI Number 14, Filed April 7, 2016, Proposed by #11061, Effective 4/1/2016, Expires 4/1/2026.