N.H. Admin. Code § Env-Dw 1403.02

Current through Register No. 50, December 12, 2024
Section Env-Dw 1403.02 - Additional Eligibility Criteria for Construction Projects

In order to be eligible for financial assistance from the PFAS RLF, construction projects also shall:

(a) Comply with applicable federal requirements;
(b) Comply with applicable state design criteria as specified in Env-Dw 400;
(c) For water supply treatment, be based on a 20-year life expectancy from the estimated date of initiation of operation; and
(d) For design capacity for intake or raw water mains, be based on a 40-year life expectancy from the estimated date of initiation of operation.

N.H. Admin. Code § Env-Dw 1403.02

Derived from Volume XLI Number 6, Filed February 11, 2021, Proposed by #13164, Effective 1/26/2021, Expires 1/26/2031.