Current through Register No. 50, December 12, 2024
Section Env-Dw 1203.14 - Requirements Prior to Operating(a) No person shall construct a new PORS or expand an existing PORS until all required state and local approvals have been obtained.(b) The PORS O/O shall comply with Env-Dw 405.33(g) and (h) relative to flushing and chlorination of the water distribution piping and checking the piping for leaks, except that any reference to "water system" shall be deemed to mean "privately owned redistribution system".(c) Upon completion of the construction of a new PORS or expansion of an existing PORS, including all required testing, and before any service is offered, the PORS O/O shall notify the department in writing, which may be transmitted by e-mail, that the PORS is ready to be inspected. The department shall conduct a sanitary survey of the system within 5 working days of receiving such notice.N.H. Admin. Code § Env-Dw 1203.14
#9572, INTERIM, eff 10-21-09, EXPIRES: 4-19-10; ss by #9660, eff 2-24-10
Amended by Volume XXXVIII Number 32, Filed August 9, 2018, Proposed by #12582, Effective 7/24/2018, Expires 7/24/2028.