N.H. Admin. Code § Env-Dw 1104.10

Current through Register No. 50, December 12, 2024
Section Env-Dw 1104.10 - Planning Document

The planning document required by Env-Dw 1104.06(a)(3) shall facilitate review of the proposed project and alternatives thereto from the viewpoints of function, operation, economics, reliability, safety, efficiency, cost-effectiveness, and environmental compatibility, by providing the following:

(a) Identification of the planning area boundaries and characteristics and the existing needs related to the water system;
(b) A cost-benefit analysis of feasible water systems or conveyance alternatives capable of meeting state and federal requirements, which details all monetary costs including the present worth or equivalent annual value of all capital costs and operation;
(c) All information necessary for the design of the proposed project and alternatives;
(d) The most current estimate of project cost itemized as to major facilities or items including land and easement costs, fees for engineering services, fees for legal services, fees for financial services, contingencies, and interest during construction;
(e) A statement of the legal, institutional, managerial, and financial capacity to construct, operate, and maintain the water system as specified in Env-Dw 601; and
(f) A statement that the applicant has a program in place for funding the maintenance and eventual replacement of the funded asset, or, if there is no such program in place, a plan for developing an asset maintenance and renewal plan as part of the funded infrastructure project.

N.H. Admin. Code § Env-Dw 1104.10

(See Revision Note at chapter heading for Env-Dw 1100) #8702, eff 8-24-06

Amended by Volume XXXV Number 06, Filed February 12, 2015 , Proposed by #10772, Effective 1/24/2015, Expires1/24/2025.