Current through Register No. 50, December 12, 2024
Section Env-Dw 1104.02 - Additional Eligibility Criteria In order to be eligible for financial assistance from the DWSRF, infrastructure projects also shall:
(a) Comply with applicable federal requirements;(b) Comply with applicable state design criteria as specified in Env-Dw 400;(c) For water supply treatment, distribution, or storage projects, meet eligible design capacity as determined in accordance with the following: (1) The eligible design capacity shall be based on average daily flow and peak flows in accordance with population and per capita flow figures;(2) Eligible design capacity for treatment facilities shall be based on a period of 20 years from the estimated date of initiation of operation; and(3) Eligible design capacity for water distribution mains and intake or raw water mains shall be based on 40 years from the estimated date of initiation of operation; and(d) If a distribution system, consist of the common lines of the water system that distribute water directly from source or treatment facilities.N.H. Admin. Code § Env-Dw 1104.02
(See Revision Note at chapter heading for Env-Dw 1100) #8702, eff 8-24-06
Amended by Volume XXXV Number 06, Filed February 12, 2015 , Proposed by #10772, Effective 1/24/2015, Expires1/24/2025.