N.H. Admin. Code § Env-C 502.15

Current through Register No. 50, December 12, 2024
Section Env-C 502.15 - Qualifying project

"Qualifying project" means a project on which the principal of the applicant worked that is represented by the plans and specifications submitted with an application to demonstrate the applicant's capabilities to work in the category for which prequalification is sought.

N.H. Admin. Code § Env-C 502.15

Readopted with Amendments and Renumbered byVolume XXXIV Number 33, Filed August 14, 2014, Proposed by #10644, Effective 7/22/2014, Expires7/22/2024 See Revission note.